Black Interiors- 345 Queen Street Auckland Level 3/4 HVAC Upgrade
- Project: Commercial HVAC
- Location: Level 3-4, 345 Queen Street, Auckland
- Date completed: August 2022
Savory Construction- Counties Power HVAC Upgrade
Server Room Upgrade
- Project: Commercial HVAC
- Location: Nelson Street, Pukekohe
- Date completed: Ongoing Dec 2021-present
Coresteel Buildings- Hynds Pukekohe HVAC & Electrical
- Project: Commercial HVAC & Electrical works
- Location: Nelson Street, Pukekohe
- Date completed: August 2022
Southbase Construction Beachlands School- HVAC Upgrade
Supplied & installed a multi VRF Air conditioning system to multiple classrooms with a control system
- Project: Industrial HVAC
- Location: 18 Bell Road, Beachlands
- Date completed: May 2022
Southbase Construction Maraetai Primary School- HVAC Upgrade
Supplied & installed a multi VRF Air conditioning system to multiple classrooms with a control system
- Project: Industrial HVAC
- Location: 154 Maraetai Drive, Maraetai
- Date completed: June 2022
NZ Steel MCC Room
ACSL Group repaired and replaced an existing PAC unit in the MCC Room at New Zealand Steel.
- Project: Industrial HVAC
- Location: 131 Mission Bush Road, Glenbrook
- Date completed: June 2021
Unitec Lecture Theatre HVAC upgrade
ACSL Group carried out a full HVAC system upgrade in the Unitec Lecture Theatre.
Project: Commercial HVAC
Location: 139 Carrington Road, Mount Albert
Date completed: April 2021
JUMP! Takanini
This was a complete design and build solution of a top of the line HVAC system. Using Temperzone rooftop package units and Fujitsu J-Series heat pumps.Customised Ductsox was used to distribute the conditioned air throughout the park.
- Project: Commercial HVAC
- Location: Great South Road, Takanini
- Date completed: March 2019
The Pokeno Whisky Company
ACSL Group worked with The Pokeno Whisky Company and Coresteel buildings to provide a complete electrical build of the new Pokeno whisky distillery. Being a complex installation within hazardous areas this project saw us installing everything from the MSB to ethanol detection systems and explosive-proof fittings
- Project: Commercial Electrical
- Location: Pokeno Whisky Distillery, Pokeno
- Date completed: February 2019
NZ Steel Emergency Coal Yard Upgrade
ACSL Group was given the task of upgrading the existing cabling infrastructure for the emergency coal yard
- Project: Industrial Electrical
- Location: Glenbrook Steel Mill
- Date completed: August 2018